Article
Publication date: 28 February 2023

Lin-Lin Xie, Yajiao Chen, Sisi Wu, Rui-Dong Chang and Yilong Han

Project scheduling plays an essential role in the implementation of a project due to the limitation of resources in practical projects. However, the existing research tend to…

Abstract

Purpose

Project scheduling plays an essential role in the implementation of a project due to the limitation of resources in practical projects. However, the existing research tend to focus on finding suitable algorithms to solve various scheduling problems and fail to find the potential scheduling rules in these optimal or near-optimal solutions, that is, the possible intrinsic relationships between attributes related to the scheduling of activity sequences. Data mining (DM) is used to analyze and interpret data to obtain valuable information stored in large-scale data. The goal of this paper is to use DM to discover scheduling concepts and obtain a set of rules that approximate effective solutions to resource-constrained project scheduling problems. These rules do not require any search and simulation, which have extremely low time complexity and support real-time decision-making to improve planning/scheduling.

Design/methodology/approach

The resource-constrained project scheduling problem can be described as scheduling a group of interrelated activities to optimize the project completion time and other objectives while satisfying the activity priority relationship and resource constraints. This paper proposes a new approach to solve the resource-constrained project scheduling problem by combining DM technology and the genetic algorithm (GA). More specifically, the GA is used to generate various optimal project scheduling schemes, after that C4.5 decision tree (DT) is adopted to obtain valuable knowledge from these schemes for further predicting and solving new scheduling problems.

Findings

In this study, the authors use GA and DM technology to analyze and extract knowledge from a large number of scheduling schemes, and determine the scheduling rule set to minimize the completion time. In order to verify the application effect of the proposed DT classification model, the J30, J60 and J120 datasets in PSPLIB are used to test the validity of the scheduling rules. The results show that DT can readily duplicate the excellent performance of GA for scheduling problems of different scales. In addition, the DT prediction model developed in this study is applied to a high-rise residential project consisting of 117 activities. The results show that compared with the completion time obtained by GA, the DT model can realize rapid adjustment of project scheduling problem to deal with the dynamic environment interference. In a word, the data-based approach is feasible, practical and effective. It not only captures the knowledge contained in the known optimal scheduling schemes, but also helps to provide a flexible scheduling decision-making approach for project implementation.

Originality/value

This paper proposes a novel knowledge-based project scheduling approach. In previous studies, intelligent optimization algorithm is often used to solve the project scheduling problem. However, although these intelligent optimization algorithms can generate a set of effective solutions for problem instances, they are unable to explain the process of decision-making, nor can they identify the characteristics of good scheduling decisions generated by the optimization process. Moreover, their calculation is slow and complex, which is not suitable for planning and scheduling complex projects. In this study, the set of effective solutions of problem instances is taken as the training dataset of DM algorithm, and the extracted scheduling rules can provide the prediction and solution of new scheduling problems. The proposed method focuses on identifying the key parameters of a specific dynamic scheduling environment, which can not only reproduces the scheduling performance of the original algorithm well, but also has the ability to make decisions quickly under the dynamic interference construction scenario. It is helpful for project managers to implement quick decisions in response to construction emergencies, which is of great practical significance for improving the flexibility and efficiency of construction projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 8 November 2022

Yilong Ren and Jianbin Wang

The missing travel time data for roads is a common problem encountered by traffic management departments. Tensor decomposition, as one of the most widely used method for…

Abstract

Purpose

The missing travel time data for roads is a common problem encountered by traffic management departments. Tensor decomposition, as one of the most widely used method for completing missing traffic data, plays a significant role in the intelligent transportation system (ITS). However, existing methods of tensor decomposition focus on the global data structure, resulting in relatively low accuracy in fibrosis missing scenarios. Therefore, this paper aims to propose a novel tensor decomposition model which further considers the local spatiotemporal similarity for fibrosis missing to improve travel time completion accuracy.

Design/methodology/approach

The proposed model can aggregate road sections with similar physical attributes by spatial clustering, and then it calculates the temporal association of road sections by the dynamic longest common subsequence. A similarity relationship matrix in the temporal dimension is constructed and incorporated into the tensor completion model, which can enhance the local spatiotemporal relationship of the missing parts of the fibrosis type.

Findings

The experiment shows that this method is superior and robust. Compared with other baseline models, this method has the smallest error and maintains good completion results despite high missing rates.

Originality/value

This model has higher accuracy for the fibrosis missing and performs good convergence effects in the case of the high missing rate.

Details

Smart and Resilient Transportation, vol. 4 no. 3
Type: Research Article
ISSN: 2632-0487

Keywords

Article
Publication date: 1 January 2009

Li Genpan

The purpose of this paper is to demonstrate that the sustainable development thought is one good reason why Chinese civilization is continuously developing, and it can be used as…

2899

Abstract

Purpose

The purpose of this paper is to demonstrate that the sustainable development thought is one good reason why Chinese civilization is continuously developing, and it can be used as a reference for the development of Chinese agriculture today.

Design/methodology/approach

The paper employs a historical analysis approach to examine the sustainable thoughts concerning Chinese traditional agriculture, including view of sancai, farming season, fertility, the nature of matters, recycling, and economization.

Findings

The results reveal that the nature of Chinese traditional agriculture is akin to ecological agriculture, which is precious heritage for China and the whole world.

Originality/value

The originality of this paper is that it confirms the fundamental reason of the continuous development of Chinese civilization which, based on organization of sustainable development thought, lies in traditional agriculture.

Details

China Agricultural Economic Review, vol. 1 no. 1
Type: Research Article
ISSN: 1756-137X

Keywords

Article
Publication date: 7 January 2020

Weihua Deng, Pei Lv, Ming Yi and Ming Liu

The purpose of this paper is to reveal the co-editing mechanism aiming at content creation, and an entry of online encyclopedia is taken as a case, for the purpose of promoting…

Abstract

Purpose

The purpose of this paper is to reveal the co-editing mechanism aiming at content creation, and an entry of online encyclopedia is taken as a case, for the purpose of promoting and enhancing the development of wiki-based digital humanities projects (WDHPs), specifically, the projects that focus on gathering contextual information in the culture heritage domain.

Design/methodology/approach

An exploratory study was conducted by three steps. A representative entry’s editorial records were reorganized to obtain a data set of discussion statements (n=608), based on which linked-structures were built, and PageRank algorithm was used to analyze the co-editing process. Skewness statistic was applied to measure the consensus of co-editing, and consensus evolution over time was explored. Linear or curve fitting was performed to analyze the correlation between consensus evolution and its influential factors.

Findings

In WDHPs, co-editing activity of content creation can be considered as a large-scale group discussion, consensus can evaluate the efficiency of co-editing, which evolves with time and is influenced by the number of statements, breadth and depth of argumentation structure. Taking “Mogao Grottoes” as an example, group discussions around 15 key issues dominate the content creating process, consensus is on a rise with time, finally reaches a relatively high level, and consensus evolution is more influenced by breadth than by depth of argumentation structure, which indicates that co-editing efficiency of “Mogao Grottoes” is fine and more argumentation in a depth manner should be guided.

Practical implications

For researchers of WDHPs, it is beneficial to apply online encyclopedia platform combining with consensus analysis to develop WDHPs. For designers of WDHPs, the elements related to argumentation structure can be absorbed into the design to promote co-editing in an effective manner. For DH researchers, the analytic procedure can be beneficial of revealing the interest of contributors in a specific DH field.

Originality/value

This research is novel in comprehensively understanding co-editing mechanism of content creation in WDHPs, resulting in a three-step analytic procedure of presenting co-editing process, evaluating and improving co-editing efficiency.

Details

Aslib Journal of Information Management, vol. 72 no. 2
Type: Research Article
ISSN: 2050-3806

Keywords

1 – 4 of 4